The engineer responsible for the replacement of the swivel Butt Bridge with the fixed span we see today.
The consulting engineers responsible for the East-Link Bridge.
The firm responsible for the design of the two West-Link Bridges in Dublin.
The principal bridge engineer in Dublin Corporation from 1976 to 1996.